2016 realuminization.
M1 was ready by 08/08/16.
See the
08/06/16 email
from Gary Rosenbaum.
M1 after realuminization at Sunnyside.
Lowering M1 into FLWO transport box at Sunnyside.
M1 just before mounting on 08/26/16, still protected with opticoat.